OUR PROJECTS | ||
---|---|---|
NAME | DESCRIPTION | VALUE |
SAUDI ARAMCO,DAS |
Providing Operation & Maintences Services for HVAC work in Dhahran Alhiya School |
1.5 Million (SAR) |
SAUDI ARAMCO CDC, DHAHRAN |
Providing Operation & Maintences Services for HVAC works in CDC Dhahran |
9.1 Million (SAR) |
SAUDI ARAMCO CDC, DHAHRAN |
Providing Operation & Maintences Services for Electrical Works in CDC Dhahran |
7.8 Million (SAR) |
SAUDI ARAMCO (MACE), SHAYBAH |
Installation of 13.8 KV / 480 V Transformers, Grounding System, Modification of 13.8 KV Overhead Line, Testing & Commissioning for Sabkah 40, 62 and 53. |
1.02 Million (SAR) |
SAUDI ARAMCO (R.H.MARRI), SHAYBAH |
Testing & Pre-commissioning of 480V switch rack, lighting system and grounding system (15 Sets Scraper Facilities) |
0.4 Million (SAR) |
SAUDI ARAMCO (SHEDGUM GAS PLANT) |
Roof Leakage for Control Room & Construction, Fabrications and installation of GI Sheets for Military Garage in Shedgum ARAMCO. |
0.5 Million (SAR) |
ORYX E & C | Management and Supervisory services for Installation of Elevator in Abqaiq, Dhahran Mubaraaz ARAMCO |
0.3 Million (SAR) |
ASTALDI ARABIA LTD, RIYADH |
Providing Transportation for Thousand workers for (JER) Project. |
2.52 Million (SAR) |
AGAS INTERNATIONAL |
Installation of 4 Nos skid mounted Boiler, cooling tower, compressor and agitators 14 Nos structural fabrication of plant building for RFO Plant at Bahrain |
4 Million (SAR) |
SAUDI ARAMCO |
Construction of building, Scope of work included but not limited to construction of concrete walls, masonary, HVAC, plumbing and utility piping, steel structures, lighting, fire alarm and smoke detection |
1.5 Million (SAR) |
AL OSAIS CONTRACTING CO. DAMMAM |
Plant Substation Works and misc. Modification. Civil jobs include excavation, foundation work, structural work and other civil activities for construction of 3 substations for water well. Electrical works includes fixing of panel bard splicing lobs and connecting to SCECO main line. Instrumentation jobs include valves replacement, replacement of starters and other piping jobs |
2.3 Million (SAR) |
YANSAB (AL-SUWAIDI) SAUDI ARABIA |
Installation of complete Electrical and Instrumentation work for HDPE plant including, cable trays/supports, Panel erection, cable laying, Lighting, Calibration and Installation of field instruments, SS and Copper Tubing, Grounding system testing and commissioning. CONSULTANT : SHAW STONE WEBSTER CANADA |
6.84 Million (SAR) |
SAUDI ARAMCO (R.H.MARRI) SHAYBAH |
Modification of 13.8 KV overhead lines. Installation, Testing and Commissioning O/H transformers. |
0.4 Million (SAR) |
SAUDI ARAMCO (R.H.MARRI) SHAYBAH |
Testing & Pre-commissioning of 480V switch rack, lighting system and Grounding system. (15 Sets in scraper facilities) |
0.3 Million (SAR) |
SAUDI ARAMCO (S.A.S) SHAYBAH |
Modification of 13.8 KV overhead line. Installation, Testing and Commissioning 480 V Switch racks & O/H transformers. |
0.5 Million (SAR) |
SAUDI ELECTRICITY COMPANY, NAZRAN |
Installation of 13.8 KV, 33 KV Transformers, Installation of Poles, stringing of conductors HT/LT , Installations of Energy Meters and underground cabling |
2 Million (SAR) |
SAUDI ARAMCO (MACE), UTHMANIA |
Installation, Testing & Commissioning of Switch rack, Lighting and Grounding system for GAS WELLHEAD. |
2.1 Million (SAR) |
SAUDI KAYAN, AL-SUWAIDI JUBAIL |
Installation of complete Electrical and Instrumentation work for EC/DMC, Poly Carbonate plant including, cable trays / supports, Panel erection, cable laying for 360 km of MV, LV power and control cables, Instrument cable, Fire Alarm cable and Fiber optic cable. Grounding system testing and commissioning. CONSULTANT : DAELIM KOREA |
4 Million (SAR) |
SAUDI KAYAN, DEALIM JUBAIL |
Installation of complete Electrical system including lighting, cable trays terminations, Testing and commissioning of motors, assistance for Testing of ABB make PCC/MCC |
1.4 Million (SAR) |
SAUDI ARAMCO MACE, JUBAIL, ABUALI |
Installation and testing for O/H Transformer. Modification of 13.8 Kv O/H line. |
0.1 Million (SAR) |
SAUDI ARAMCO (MACE), SHAYBAH |
Modification of 13.8 KV overhead lines and Installation of Transformers for Cathadic Protection system. CONSULTANT : FLOUR |
2.1 Million (SAR) |
SAUDI ARAMCO JHAH HOSPITAL, DHAHRAN |
Installation, Testing & Commissioning of Isolation Panels and Complete wiring for ORS |
0.5 Million (SAR) |
SAUDI ARAMCO QYD CO LTD, SHAYBAH |
Power supply for STC / Mobily Towers including insatllation of 13.8 KV / 75 KVA Transformer and Modification of over head line |
0.3 Million (SAR) |
SAUDI ARAMCO QYD CO LTD, SHAYBAH |
Conversion of 13.8 KV line to Underground Cable for Oman Highway (900 mtr.) |
0.5 Million (SAR) |